Keeping the elevator drawings in step with the house
Throughout design and construction, we review every update to your architectural, structural, and electrical plans alongside your architect and builder. Together we verify door placement, landing trim, and smooth rider routes at every floor. Once the shaft is framed and finished, our crew installs the elevator near the end of construction and walks you through daily controls and routine service.
Coordinate the elevator and building approvals
We submit your state elevator permit early to Washington L&I (allowing around 30 business days for review) and schedule the final L&I inspection before move-in. Meanwhile, we keep shaft drawings synchronized with your builder's local city building and electrical permits.
Working on a home that is already built? Browse our full range of elevators for Bellevue homes.